**WO-TRUSTS-20261014-IMERYS · Checked October 14, 2026 · Version 1.0-draft · Prepared by Manus**

**Tier 2: draft only.** No publication, deployment, merge, site-main commit or public preview URL. ANCHOR editing → CLEO final QA → Charles publication gate pending. No qualified legal review completed.

## Plan and disclosure status

The **latest filed plan located in this check** is Imerys **D.I. 8070, filed January 20, 2026**, coordinated with Cyprus **D.I. 3676**, filed the same day. It defines the proposed **Ivory America / Cyprus Personal Injury Trust**. D.I. 8146 records that the confirmation hearing resumed February 2, 2026 on those plans. D.I. 8072’s attached confirmation order is expressly **proposed**, not a signed judgment. [1] [2] [3]

**As checked October 14:** no signed confirmation order, district-court affirmation, effective-date notice, or evidence of an operating trust was retrieved. The record retains the work order’s **October 9, 2026 “proposed trust / plan pending” baseline**; this is not a complete primary-docket certification that no later order exists. No live payment percentage, claims-filing process, trust balance or payments are established by this check.

Official case-agent material records disclosure approval and solicitation on **November 5, 2024**, a **December 16, 2024** vote deadline and **January 5, 2025** certifications. Thus, “still awaiting initial authorization to solicit” is not a verified current description. The actual court disposition of later amendments—including any new disclosure/re-solicitation requirement—remains unresolved. The 2024 signed approval orders were not independently retrieved in full. [4]

## Primary verification and material corrections

The official Third Circuit opinion **No. 25-2786, October 9, 2026**, dismisses RMI Insurers’ appeal of the J&J indemnification-rights sale as moot under **§363(m)**. It is nonprecedential and does not confirm a Chapter 11 plan or establish trust operations. [5]

The funding draft separately records proposed cash, contractual obligations, **Cyprus’s $195 million seven-year note principal**, and unvalued rights/assets. No pools are summed or labeled current assets. Cyprus plan/note evidence was recovered, narrowing—not closing—the supplied Cyprus-document gap. [1] [6]

The purported fresh “eighth plan / $130M Cyprus” lead matches a Bloomberg Law article dated **January 21, 2021**, not October 2026. It is excluded as current news. Its historical amount is not substituted for the current note. The stale/blank September 2025 landing-page pointer is replaced by the January 2026 filed package **latest located**, not an unsupported claim of the definitive latest plan.

## ANCHOR edit — October 26, 2026

Docket refreshed. The case agent's plan filter shows nothing after D.I. 8116 (February 11, 2026), so D.I. 8070 is still the latest plan located. Among the entries read through D.I. 8559 (October 20), none identified by subject is a confirmation order, affirmation, effective-date notice or operating-trust record. That finding is bounded by two orders that could not be identified by subject, D.I. 8480 (September 15) and D.I. 8505 (September 28), could not be identified by subject, and the September 28 hearing was cancelled (D.I. 8506). The September 15 conference outcome therefore remains unestablished. D.I. 7895 (November 18, 2025) is a lead for the re-solicitation question. Proposed-only framing is unchanged throughout.

## Open questions for ANCHOR

Recover any later plan amendments and actual confirmation/disclosure orders; the **September 15, 2026 conference outcome**; affirmation/effectiveness and operating-trust evidence; actual funding transfers, net Sale Proceeds and QSF/insurance balances. **D.I. 8462, filed September 11**, verifies the scheduled conference and insurer abeyance request, not the result. Proof-of-claim counts and tonnage remain unverified. The owner should supply the intended AsbestosAtlas Imerys deep link. [7]

**Access/review limits:** Dynamic docket/browser access was incomplete; direct filed documents were recovered, but public mirrors were not treated as a complete docket. The October 12 reference package and later build records were unavailable. The GitHub ledger could not be accessed/committed; owner-ready entry text is in **imerys-sources.md**. All three attachments are complete draft artifacts, not publication-cleared content.

## References

[1]: https://cases.ra.kroll.com/IMERYSTALC/Home-DownloadPDF?id1=MjgwMzM5NQ==&id2=-1 "Imerys D.I. 8070 — plan, January 20, 2026"
[2]: https://cases.ra.kroll.com/IMERYSTALC/Home-DownloadPDF?id1=MjgwNjAyMw==&id2=-1 "Imerys D.I. 8146 — February 11, 2026 evidence notice, p. 1"
[3]: https://cases.ra.kroll.com/IMERYSTALC/Home-DownloadPDF?id1=MjgwMzQwMw==&id2=-1 "Imerys D.I. 8072 — proposed-order notice, January 20, 2026, p. 2"
[4]: https://cases.ra.kroll.com/iandctalc/ "Official joint case-agent procedural narrative, checked October 14, 2026"
[5]: https://www2.ca3.uscourts.gov/opinarch/252786np.pdf "Third Circuit No. 25-2786 — October 9, 2026 opinion, pp. 1–2"
[6]: https://cases.ra.kroll.com/cyprusmines/Home-DownloadPDF?id1=MjgwMzQxMA==&id2=-1 "Cyprus D.I. 3676 — January 20, 2026 plan, §§1.1.45 and 1.1.160"
[7]: https://cases.ra.kroll.com/IMERYSTALC/Home-DownloadPDF?id1=MjgyODE4Mw==&id2=0 "Imerys D.I. 8462 — September 11, 2026 agenda, p. 2"